Applied Power and Controls, Inc.’s role in the project
was to provide “Technical Assistance” during the Construction
Phase for the replacement of two (2) 2500KVA Unit Substations
located on the mezzanine level of the Detroit Department
of Transportation (DDOT) Central Maintenance Facility.
The Project also involved installation of new redundant
feed to the Fire Pump located in the service building.
The Project also included complete replacement of the
15KV Primary Cables between the primary switchgear and
the service building. Our role also included started of
a new Automatic Transfer Switch and owner training.